Broadcast News
15/01/2008
XL Video Supplies 'Liverpool The Musical'
XL Video supplied video projection, cameras, PPU and an orchestra monitoring system for 'Liverpool The Musical', the sold out official launch show of the City’s new 10,000 seater Echo Arena Liverpool.
This was the second major event of a weekend kick-starting ‘Liverpool 08’ – the city’s year as European Capital of Culture, and followed hot on the heels of open air 'People’s Opening Ceremony' on Friday night.
XL’s project manager was Malcolm Mellows. XL’s busy UK office was brought aboard the Liverpool The Musical technical team by production manager Nick Handford to provide playback facilities and a live IMAG camera mix directed by John Shrimpton.
This was beamed onto a 17 metre high, 29 metre high scrim covering an upstage scaffolding structure that housed the Royal Liverpool Philharmonic Orchestra, conducted by Vasily Petrenko in a 7 layer formation. Petrenko was stationed on a scissor lift on the stage immediately in front of the scrim. A total of eighty 8.5” LCD monitors were supplied and distributed by XL Video, one for each orchestra member, showing the conductor and enabling the musicians to play in time.
'Liverpool The Musical' was a 2 hour long performance crafted into an innovative contemporary and classical music and visuals show, starring some of Liverpool’s finest talent and popular artists like Ringo Starr, Pete Wylie, The Farm, Garry Christian, Echo & The Bunnymen, Shack, etc.
The show was produced by Jon Drape and creatively directed by Nigel Jamieson & Jayne Casey, also responsible for The People’s Opening. It was Dan Potra’s spectacular industrially-orientated production design that included the massive scaffolding structure.
The scaff structure was covered in a tight semi-translucent gauze supplied by Tildanet, which formed the projection surface.
It completely hid the orchestra when running in full projection mode, whilst allowing them to be subtly and blatantly revealed through silhouetting and other lighting magic fashioned by LD Andy Liddle.
To cover the surface with projections, XL supplied three overlaid Christie 20K machines rigged in front of the stage on their own truss.
The playback material was co-ordinated by Phil Halpin of locally based Mocca working closely with another Liverpool company, Sparkle Media. The original material was reformatted as necessary on site and programmed onto XL’s two High Definition Doremi hard drives – with the final elements being edited into the show at 5.30 p.m. on the day – such was the fluid nature of the production.
The playback fused a narrative storyline and historical detail relating to the city with more imaginative/expressive graphics and abstract animations. Archive material was sourced from various resources in and around Liverpool and original footage was specially commissioned and filmed.
Shrimpton cut the live camera mix from 3 operated cameras – two at FOH and one in the pit, plus one remote mini-cam for Petrenko. Petrenko’s image was beamed to the mini plasmas in each of the orchestra compartments on the scaffolding wall – behind the gauze - clipping neatly onto the sides of the music stands.
The mixer switcher was a GV Kayak, Shrimpton’s console of choice. The IMAG images he picked and output were extremely clean, and some were very subtly affected before being diligently dovetailed with the playback footage that ran for most of the show.
XL also supplied full technical and stage management monitoring/CCTV throughout backstage, 3 large plasma screens for the VIP area and two Barco Solaris 40 inch plasmas as front-of-stage monitoring for the choir. The technical feeds were routed via a separate matrix to the main console.
Shrimpton said: "It’s always a challenge working in a new space, and it was a privilege to help launch this Arena and work on this very special event. We had to do plenty of thinking on our feet as the show was evolving continually through the rehearsal period, and I think the results were stunning."
XL’s crew consisted of Matt Vassallo (engineer), Mark Hughes (projectionist), Luke Levitt, Andy Warwick and Hugo Leven (cameras), Carl Martin, who looked after all plasmas including the orchestra system and John Wynne, who also plasma tech’d and crew chiefed.
The orchestra structure and stage was built by the Star Events Group. Star Rigging – also the house riggers – did the rigging. Stage One supplied the plant and hydraulics, Wigwam provided audio equipment (sound designed by Geoff Muir), and Hawthorne Theatrical did the lighting.
For further information:
www.xlvideo.tv
(DS)
This was the second major event of a weekend kick-starting ‘Liverpool 08’ – the city’s year as European Capital of Culture, and followed hot on the heels of open air 'People’s Opening Ceremony' on Friday night.
XL’s project manager was Malcolm Mellows. XL’s busy UK office was brought aboard the Liverpool The Musical technical team by production manager Nick Handford to provide playback facilities and a live IMAG camera mix directed by John Shrimpton.
This was beamed onto a 17 metre high, 29 metre high scrim covering an upstage scaffolding structure that housed the Royal Liverpool Philharmonic Orchestra, conducted by Vasily Petrenko in a 7 layer formation. Petrenko was stationed on a scissor lift on the stage immediately in front of the scrim. A total of eighty 8.5” LCD monitors were supplied and distributed by XL Video, one for each orchestra member, showing the conductor and enabling the musicians to play in time.
'Liverpool The Musical' was a 2 hour long performance crafted into an innovative contemporary and classical music and visuals show, starring some of Liverpool’s finest talent and popular artists like Ringo Starr, Pete Wylie, The Farm, Garry Christian, Echo & The Bunnymen, Shack, etc.
The show was produced by Jon Drape and creatively directed by Nigel Jamieson & Jayne Casey, also responsible for The People’s Opening. It was Dan Potra’s spectacular industrially-orientated production design that included the massive scaffolding structure.
The scaff structure was covered in a tight semi-translucent gauze supplied by Tildanet, which formed the projection surface.
It completely hid the orchestra when running in full projection mode, whilst allowing them to be subtly and blatantly revealed through silhouetting and other lighting magic fashioned by LD Andy Liddle.
To cover the surface with projections, XL supplied three overlaid Christie 20K machines rigged in front of the stage on their own truss.
The playback material was co-ordinated by Phil Halpin of locally based Mocca working closely with another Liverpool company, Sparkle Media. The original material was reformatted as necessary on site and programmed onto XL’s two High Definition Doremi hard drives – with the final elements being edited into the show at 5.30 p.m. on the day – such was the fluid nature of the production.
The playback fused a narrative storyline and historical detail relating to the city with more imaginative/expressive graphics and abstract animations. Archive material was sourced from various resources in and around Liverpool and original footage was specially commissioned and filmed.
Shrimpton cut the live camera mix from 3 operated cameras – two at FOH and one in the pit, plus one remote mini-cam for Petrenko. Petrenko’s image was beamed to the mini plasmas in each of the orchestra compartments on the scaffolding wall – behind the gauze - clipping neatly onto the sides of the music stands.
The mixer switcher was a GV Kayak, Shrimpton’s console of choice. The IMAG images he picked and output were extremely clean, and some were very subtly affected before being diligently dovetailed with the playback footage that ran for most of the show.
XL also supplied full technical and stage management monitoring/CCTV throughout backstage, 3 large plasma screens for the VIP area and two Barco Solaris 40 inch plasmas as front-of-stage monitoring for the choir. The technical feeds were routed via a separate matrix to the main console.
Shrimpton said: "It’s always a challenge working in a new space, and it was a privilege to help launch this Arena and work on this very special event. We had to do plenty of thinking on our feet as the show was evolving continually through the rehearsal period, and I think the results were stunning."
XL’s crew consisted of Matt Vassallo (engineer), Mark Hughes (projectionist), Luke Levitt, Andy Warwick and Hugo Leven (cameras), Carl Martin, who looked after all plasmas including the orchestra system and John Wynne, who also plasma tech’d and crew chiefed.
The orchestra structure and stage was built by the Star Events Group. Star Rigging – also the house riggers – did the rigging. Stage One supplied the plant and hydraulics, Wigwam provided audio equipment (sound designed by Geoff Muir), and Hawthorne Theatrical did the lighting.
For further information:
www.xlvideo.tv
(DS)
Top Related Stories
Click here for the latest broadcast news stories.
03/06/2011
Creative Audio Production Takes Centre Stage At Liverpool Sound City 2011
Musicians and budding record producers turned out in force for the creative audio production workshops that took place at Liverpool Sound City 2011. H
Creative Audio Production Takes Centre Stage At Liverpool Sound City 2011
Musicians and budding record producers turned out in force for the creative audio production workshops that took place at Liverpool Sound City 2011. H
20/01/2022
Liverpool Philharmonic Deploys Riedel's Bolero Wireless Intercom System
Riedel Communications has announced that Liverpool Philharmonic has deployed the company's Bolero wireless intercom system in a standalone configurati
Liverpool Philharmonic Deploys Riedel's Bolero Wireless Intercom System
Riedel Communications has announced that Liverpool Philharmonic has deployed the company's Bolero wireless intercom system in a standalone configurati
04/10/2023
PMC Studios Hosts Atmos Mixing Sessions For Orchestra of the Swan
PMC's London studio is rapidly becoming the go-to facility for producers and engineers who want to experiment with mixing music in Dolby Atmos. Specif
PMC Studios Hosts Atmos Mixing Sessions For Orchestra of the Swan
PMC's London studio is rapidly becoming the go-to facility for producers and engineers who want to experiment with mixing music in Dolby Atmos. Specif
07/08/2014
DPA Captures Kyteman Orchestra
Front of House engineer Sjoerd Terpstra selected DPA mics to capture the Kyteman Orchestra when they played six concerts at the Utrecht Tivoli in Holl
DPA Captures Kyteman Orchestra
Front of House engineer Sjoerd Terpstra selected DPA mics to capture the Kyteman Orchestra when they played six concerts at the Utrecht Tivoli in Holl
30/09/2011
'Film Star' Soloist Plays With Ulster Orchestra
Classical Brit Award-winning violinist, Jack Liebeck, is back in Belfast by popular demand on Friday night, 10 months after he last played with the Ul
'Film Star' Soloist Plays With Ulster Orchestra
Classical Brit Award-winning violinist, Jack Liebeck, is back in Belfast by popular demand on Friday night, 10 months after he last played with the Ul
07/01/2011
Cinematic Orchestra Chooses Soundcraft
The Cinematic Orchestra performed a large-scale concert at London's legendary Royal Albert Hall with the London Metropolitan Orchestra that required t
Cinematic Orchestra Chooses Soundcraft
The Cinematic Orchestra performed a large-scale concert at London's legendary Royal Albert Hall with the London Metropolitan Orchestra that required t
25/04/2024
Molinare Creative Group Opens Facility In Liverpool
Molinare Creative Group has announced that its DIT and LAB division, Notorious DIT, is expanding the Group's operations to the Northwest of England, o
Molinare Creative Group Opens Facility In Liverpool
Molinare Creative Group has announced that its DIT and LAB division, Notorious DIT, is expanding the Group's operations to the Northwest of England, o
22/11/2019
Liverpool Institute For Performing Arts Selects Calrec Brio 36 Broadcast Audio Console
The Liverpool Institute for Performing Arts has chosen the Calrec Brio 36 broadcast audio console for its new campus TV and recording studio. Establis
Liverpool Institute For Performing Arts Selects Calrec Brio 36 Broadcast Audio Console
The Liverpool Institute for Performing Arts has chosen the Calrec Brio 36 broadcast audio console for its new campus TV and recording studio. Establis
07/12/2018
The Liverpool Screen School Upgrades Media Infrastructure
EditShare has announced that The Liverpool Screen School has upgraded the existing media infrastructure to the latest EditShare XStream EFS storage pl
The Liverpool Screen School Upgrades Media Infrastructure
EditShare has announced that The Liverpool Screen School has upgraded the existing media infrastructure to the latest EditShare XStream EFS storage pl
11/10/2017
Production Filming Continues Across Liverpool
Liverpool Film Office is celebrating after a very busy 2016/2017 which saw a number of productions filmed in locations across the city. Fox Searchligh
Production Filming Continues Across Liverpool
Liverpool Film Office is celebrating after a very busy 2016/2017 which saw a number of productions filmed in locations across the city. Fox Searchligh
13/04/2017
Production News : Three Dramas Commence Filming In Liverpool
Three major dramas have commenced filming on location in Liverpool, it has been unveiled. David Morrissey stars as Inspector Tyador Borlúin in a BBC T
Production News : Three Dramas Commence Filming In Liverpool
Three major dramas have commenced filming on location in Liverpool, it has been unveiled. David Morrissey stars as Inspector Tyador Borlúin in a BBC T
22/11/2016
Liverpool Selected As Fantastic Beasts Location
Two locations in Liverpool have been used as filming locations in the new movie, Fantastic Beasts And Where To Find Them, by Warner Bros Pictures. The
Liverpool Selected As Fantastic Beasts Location
Two locations in Liverpool have been used as filming locations in the new movie, Fantastic Beasts And Where To Find Them, by Warner Bros Pictures. The
16/08/2016
Production News : Liverpool Welcomes Filming Boom
Liverpool Film Office has revealed that two major dramas have commenced filming in the city. An adaptation of one of Agatha Christie's best-known work
Production News : Liverpool Welcomes Filming Boom
Liverpool Film Office has revealed that two major dramas have commenced filming in the city. An adaptation of one of Agatha Christie's best-known work
29/07/2016
Liverpool Welcomes Record-Breaking Year For Productions
A record number of film and TV productions were made on location in Liverpool last year, it has been revealed. In a report, which will be sent before
Liverpool Welcomes Record-Breaking Year For Productions
A record number of film and TV productions were made on location in Liverpool last year, it has been revealed. In a report, which will be sent before
09/12/2015
New Film Suite Launched In Liverpool
The award-winning sound engineer behind Harry Potter and the Goblet of Fire, has selected Liverpool to launch his advanced post production sound and e
New Film Suite Launched In Liverpool
The award-winning sound engineer behind Harry Potter and the Goblet of Fire, has selected Liverpool to launch his advanced post production sound and e